Monthly status report for January.
Karsten Loesing

Karsten Loesing commited on 2009-01-15 16:34:53
Zeige 1 geänderte Dateien mit 29 Einfügungen und 1 Löschungen.

... ...
@@ -398,9 +398,37 @@ implementation and testing work on January 15, 2009.
398 398
 
399 399
 <tr>
400 400
   <td>
401
-    Jan 09
401
+    <a id="Jan09"></a>
402
+    <a class="anchor" href="#Jan09">Jan 09</a>
402 403
   </td>
403 404
   <td>
405
+    <small><em>The testing phase has been concluded. Testing was performed
406
+    in a public beta phase with all changes to hidden services being part
407
+    of the 0.2.1.x-alpha series. The result of the public beta phase is a
408
+    couple of identified bugs that could already be fixed.</em></small>
409
+    <br/>
410
+    <small><em>Another part of testing was a second set of measurements
411
+    that was performed in December. A
412
+    <a href="http://freehaven.net/~karsten/hidserv/comparison-2009-01-15.pdf">comparison</a>
413
+    of measurements performed in June and December has revealed that the
414
+    changes of this project are effective. Service publication times could
415
+    be more than halved from 2:12 minutes to 58 seconds in the mean. This
416
+    improvement is far better than expected. With this improvement it might
417
+    even be worthwile to think about reducing stabilization time from 30
418
+    seconds to a lower value in the future. However, connection
419
+    establishment remains at approximately 56 seconds between requesting a
420
+    hidden service to having established a connection to the hidden server.
421
+    The main reason for missing improvements is the switch from the
422
+    centralized to a decentralized storage for hidden service descriptors.
423
+    This deteriorating effect of distributing the hidden service directory
424
+    has not been expected before. Future work should focus on improving
425
+    downloads from the distributed hidden service directory, for example by
426
+    parallelizing requests.</em></small>
427
+    <br/>
428
+    <small><em>This report concludes the series of monthly status updates.
429
+    The rollout of the 0.2.1.x series including the hidden service
430
+    performance improvements is going to take place within the next weeks
431
+    to months.</em></small>
404 432
   </td>
405 433
 </tr>
406 434
 </table>
407 435