Make the last two sentences of the mid-July report sound less scary.
Karsten Loesing

Karsten Loesing commited on 2008-07-19 16:01:31
Zeige 1 geänderte Dateien mit 5 Einfügungen und 4 Löschungen.

... ...
@@ -209,10 +209,11 @@ implementation and testing work on January 15, 2009.
209 209
     <a href="http://archives.seul.org/or/dev/Jul-2008/msg00034.html">developer
210 210
     mailing list</a> including 7 possible design changes that need to be
211 211
     discussed. Some evaluations (namely Low-Bandwidth Measurements and the
212
-    Grand Scaling Plan) will be scheduled for a later time in the
213
-    project. Although the current plan is to perform these evaluations
214
-    within the timeframe until January 15, it is unlikely that their
215
-    results can be applied in the schedule of this project.</em></small>
212
+    Grand Scaling Plan) have turned out to require more time than expected
213
+    and had to be scheduled for a later time in the project than
214
+    deliverable B. The current plan is to perform these evaluations within
215
+    the timeframe until January 15 and work with assumptions until final
216
+    results are available.</em></small>
216 217